INVITATION FOR TENDER PRE-QUALIFICATION FOR WIRELINE LOGGING SERVICES FOR OML 130 – EGINA FIELD DEVELOPMENT (EGI/C068)

1. Introduction

Total Upstream Nigeria Limited (TUPNI), operator of the OML 130,

invites interested and reputable Contractors with suitably qualified employees, equipment, premises and relevant experience to apply for pre-qualification for consideration to tender for the Wireline logging services for the Deep Offshore EGINA Field Development on two rigs.

The Egina field is located offshore Nigeria on block OML130 at 200 km off Nigerian cost by 1550 m of water depth. Egina is a new standalone deepwater development using two DP rigs starting Q1 2012 with activity continuing to Q4 2016. The reservoir being highly faulted with a channels and lobes type arrangement, the well trajectories are complex with a high proportion of wells having horizontal drains. All wells comprise a sand control device (open hole gravel pack, stand alone screen or expandable sand screens).

2. Brief description of the work scope:

Contractor should be able to provide for a duration of Twenty Four (24) months with a Twelve (12) month option to extend, starting Q1 2012, the equipment, personnel and services required to perform the wireline logging services from two MODUs.

The following equipment should be required (including but not limited to):

· Offshore computerized logging skid unit including hydraulic winch, power generator and rig power back with 5000m hepta-cable allowing the simultaneous mounting on the drum with hepta-cable and the auxiliary winch with mono conductor line.

· Set of Sheaves and equipment to allow easy set up of the logging equipment and safe logging operations

· Downhole logging equipment,

· Fishing equipment,

· Auxiliary drilling equipment such as free point indicator, back off equipment, OCL, severing tool, chemical cutter, tubing cutters, tubing punchers, pip tag,

· Production logging equipment,

· Pipe conveying equipment,

· Perforation equipment,

· Personnel (offshore & onshore supervision).

Contractor should be able to provide the following service such as (but not limited to):

· Basic Wireline Formation evaluation services (GR, Resistivity, Neutron Density, Sonic, Cement Logging)

· Wireline Production Logging service package

· Wireline Production Logging service

· Advanced Wireline Formation evaluation package (Structural and Sedimentotogical imaging, formation pressure and sampling dipole sonic Magnetic Nuclear Resonance …)

· Borehole seismic services

· Perforation services

Equipment & Standard Logging Crew on permanent basis shall be exclusively dedicated to this contract. Equipment shall be identified monitored trough a tracking system and stored in an identify area in Contractor base and Contractor logging unit cabin shall be permanently located on the rig.

3. Pre-qualification Documents

3.1 -General Submission

To qualify for consideration, Contractors are required to supply two (2) sets of the following documentation, with the specific chapters separated by dividers, in the same order as set out here below (a) to (q):

a) A cover letter summarizing the contents of the pre-qualification document

b) Details of company’s Health, Safety and Environmental Policy and Programme together with HSE Management System. HSE considerations on site, and throughout the requirement are part of Contractor’s responsibility and Contractor must have proven methods for eliminating risks associated with its own scope of services and at interface with others. These methods must be dearly indicated

c) Safety records detailed for accidents, injuries, damages and summarised for near misses and LTI’s for the past three (3) years.

d) Copy of Department of Petroleum Resources (DPR) Certificate of Registration for year 2008 or 2009, or evidence of renewal, relevant to the scope of work herein described.

e) Details of Contractor’s Community Affairs Policy and Programme and records, including copy certificates, awards and the like, for the past three (3) years.

f) Quality Assurance System certified ISO 9000 or equivalent for operations and maintenance, and relevant to the scope of work herein described.

g) Details of relevant verifiable experience of similar scope of work as described herein that Contractor has undertaken in the last three (3) years, inside and outside Nigeria

h) (i) Demonstration of Contractor’s ability to carry out the scope of work as described in paragraph 2 herein.

(ii) Provide details of Contractor’s Yard, Quaysides, Workshops, base Facilities, Engineering Offices, Offices, Warehouses, Factories, Equipment and the like required to carry out the scope of work as described herein.

(iii) Submit a resources capacity plan and forecast, covering years 2012 to 2016, demonstrating that at present Contractor has sufficient needs to carry out the scope of work as described herein.

i) Reference of three of Contractor’s major customers, where similar a scope of work has been completed, who can be contacted for information and reference.

j) Contractor’s audited accounts for the past three (3) years and, if relevant, Nigerian tax clearance certificates.

k) All relevant information concerning contacts: representative’s name telephone number, facsimile machine number and e-mail address.

l) Additional Technical Information Evidence of capabilities for post delivery service support,

3.2 – Nigerian Content

In line with the Federal Government of Nigeria Directives on Nigerian Content target of 70% by year end 2010 and TUPNI general contracting-out policy to maximise Nigerian content on the Egina Project, tenderers are to include in their bids a Nigerian Content Plan on how they shall meet this requirement.

a) Evidence of Contractor’s registration in Nigeria (certificate of incorporation),

b) Contractor’s general structure and organisation, including names and curricula vitae of key personnel, indicating Nigerian Nationals on the Contractor’s Board, and identifying, relevant to the scope of work herein described, two Nigerian Director’s.

c) In case of a joint venture or partnership with another contractor provide a copy of the agreement or memorandum of understanding together with a description of the interest of each of the participants and the role of each shall play in the carrying out of the scope of work herein described.

d) Describe the locations of Contractor’s Management Offices, Engineering Offices. Fabrication Workshop and/or Yards, Procurement Centre or Centre of Core Business activities in Nigeria (relevant to the scope of work described herein)

e)<span style=”font-family: "Times New Roman"; font-style: normal; font-variant: normal;

Tags: , , , , , , , , ,

Related Tenders

· · · · · · · ·

Comments are closed.

<<

>>

Theme Design by devolux.nh2.me
Theme Tweaker by Unreal