27
Interested and reputable Contractors at Total Upstream Nigeria Limited
· Posted by tenders-bids-nigeria-1 in Government
INVITATION FOR TENDER PRE – QUALIFICATION FOR THE SUPPLY OF TURBO
GENERATOR PACKAGES FOR OML 130 - EGINA FIELD DEVELOPMENT (EGI/C119)
Introduction
Total Upstream Nigeria Limited (TUPNI), operator of the OML 130 invites interested and reputable Contractors with suitably qualified employees, equipment, premises and relevant expenence to apply for pre-qualification for consideration to tender for Engineering Procuremen / Construction / Supply and assistance to Commissioning and installation (EPC) of turbo-generator packages to be integrated on a Floating Production storage & Offloading (FPSO) unit. Only capable and reputable Contractors with a proven track record and suitable and relevant experience of similar nature and size are invited to apply for pre- qualification.
The Egina field is located offshore Nigeria at 200 km from the coast and has a water depth of 1,550 metres.
Operator of the OML 1 30 Asse
The Egina Facilities include six (6) Subsea Production manifolds, a net-work of flow-lines and risers, a Floating Production Storage and Offloading unit (FPSO) and an Oil Offloading Terminal.
The EPC contract of the Egina turbo-generators is planned to be awarded before the end of the year 201 0 / beginning of 201 1 , with a delivery of the packages to the FPSO fabrication Yard Site, for their integration, no later than 2 years after the contract award.
Brief description of the work scope:
Contractor shall, among others, provide engineering, procurement, fabrication, packaging, full load test, and transportation to the FPSO fabrication Yard of at least four (4) turbogenerator packages including for each:
· Turbo Generator which delivers approximately 23.9 MWe (30 MVA) of electrical power on site
· An Aero-derivative gas turbine with Dual Fuel SAC as Base Case with DLE as an Option: Use best available technology to ensure full combustion (efficiency 98%)
· A Waste Heat Recovery Unit (WHRU) to extract heat from the hot exhaust gas
· All associated instrumentation, control panels, MCCand Battery system
· Necessary supporting structure frame and all other auxiliaries
· Supply of spare parts for start-up and 2-years running
In addition Contractor will have to provide assistance during the pre-commissioning on
FPSO Yard Site and during the commissioning and start up Offshore of the delivered
packages.
Pre-qualification Documents
General Submission
To qualify for consideration, Contractors are required to supply two (2) sets of the following documentation, with the specific chapters separated by dividers, in the same order as set out here below (a) to (i):
(a) Acover letter summarizing the contents of the prequalification document.
(b) Details of company’s Health, Safety and Environmental Policy and Programme together with HSE Management System. HSE considerations on site, and throughout the requirement are part of Contractor’s responsibility and Contractor must have proven methods for eliminating risks associated with its own scope of services and at interfaces with others. These methods must be clearly indicated..
(c) Safety records detailed for accidents, injuries, damages and summarised for near-misses and LTI’s for the past three (3) years.
‘(d) Copy of Department of Petroleum Resources (DPR) Certificate of Registration for year 2008 or 2009, or evidence of renewal, relevant to the scope of work herein described.
(e) Details of Contractor’s Community Affairs Policy and Programme and records, including copy certificates, awards and the like, for the past three (3) years.
(f) Quality Assurance System certified ISO 9000 or equivalent for operations and maintenance, and relevant to the scope of work herein described,
(g) Details of relevant verifiable experience of similar scope of work as described herein that
Contractor has undertaken in the last three (3) years, inside and outside Nigeria,
(h) (i) Demonstration of Contractor’s ability to carry out the scope of work as described in
paragraph 2 herein
(ii) Provide details of Contractor’s Yard. Quaysides. Workshops. Base Facilities Engineering Offices. Offices. Warehouses. Factories. Equipment and the like required to carry out the scope of work as described herein
(iii) Submit a resources capacity plan and forecast, covering years,2010 to 2014, demonstrating that at present Contractor has sufficient needs to carry out the scope of work as described herein
Reference of three of Contractor’s major customers, where similar a scope of work has been completed, who can be contacted for information and referenc Contractor’s audited accounts for the past three (3) years and, if relevant. Nigeria tax clearance certificates
All relevant information concerning contacts representative s name telephone number, facsimile machine number and e-mail address
(!) Additional Technical Information
Evidence of capabilities for post delivery service support.
Nigerian Content
In line with the Federal Government of Nigeria Directives on Nigerian Content target of 70% by year end 2010 and TUPNI genera! con tracting-out policy to maximise Nigerian con tent on the Egina Project, tenderers are to include in their bids a Nigerian Content Plan on how they shall meet this requirement.
(a) Evidence of Contractor’s registration in Nigeria {certificate of incorporation).
(b) Contractor’s general structure anci organisation, including names and curricula vitae of key personnel, indicating Nigerian Nationals on the Contractor’s Board, and identifying, relevant to the scope of work herein described, two Nigerian Director’s,
(c) In case of a joint venture or partnership with another contractor provide a copy of the agreement or memorandum of understanding together with a description of the interest of each of the participants and the role of each shall play in the carrying out of the scope of work herein described.
(d) Describe the locations of Contractor’s Management Offices. Engineering Offices, Fabrication Workshop and/or Yards. Procurement Centre or Centre of Core Business activities in Nigeria (relevant to the scope of work described herein),
(e) Nigerian Employment
· Location in Nigeria of Top Management Representation as related to the Organisation Chartand identified as such,
· Skilled Nigerian staff (relevant to the work advertised) as related to the Organisation Chart and identified as such,
· Unskilled Nigerian staff (relevant to the work advertised) as related to the Organisation Chart and identified as such:
· Specialist of highly skilled Nigerian staff (relevant to the work advertised) as related to the Organisation Chart and identified as such.
(f) Ltst the elements of the scope of work to be performed, carried out or purchased in Nigeria
(g) Provide Contractor’s Policy for Training and Development of Nigerians (relevant to the
(h) Provide Contractor’s Plan for the understudying by Nigerians of Expatriates with a
programme for promotion and evidence of past training and integration of Nigerians into j the Contractor’s organisation.
(i) Provide Contractor’s Plan for complying with the target of 70% Nigerian Content (relevant to the work advertised) by the end of the year 2010.
Non compliance with Nigerian Content will constitute reason not to pre-qualify Contractor.
General
Failure to provide any of the listed documents or information may automatically disqualify the Contractor.
Notwithstanding the submission of requested forms to TUPNI, TUPNI is neither committed nor obligated to include any Contractor on any bid lists or award any form of contract to any Contractor and/or associated companies, subcontractors or agents,
This notice and the ensuring qualification process neither creates any commitment by TUPNI nor establishes any legal relationship with TUPNI.
All costs incurred as a resuit of this Pre-qualification invitation and any subsequent requests for information shall be for the responding Contractors’ account,
Special Notes
This Advertisement for Invitation to Pre-Qualify to Tender is published both in Newspapers
<p class=”MsoNormal%
Tags: Companies, Construction, Contractors, Equipment, Government, Government, Installation, Project, WaterRelated Tenders
Companies · Construction · Contractors · Equipment · Government · Installation · Project · Water
