Tender, Bids, Prequalification and Contracts in Nigeria | Get the latest Tender, Bids, Prequalification & Contracts in Nigeria

Jul/09

3

Expression of Interest at FEDERAL MINISTRY OF AGRICULTURE AND WATER RESOURCES

THE FEDERAL REPUBLIC OF NIGERIA

FEDERAL MINISTRY OF AGRICULTURE AND WATER RESOURCES

NATIONAL URBAN WATER SECTOR REFORM PROJECT

REQUEST FOR EXPRESSION OF INTEREST (EOI) FOR

ENGINEERING SUPERVISION OF OBUDU DAM REMEDIAL WORKS

This request for Expression of Interest (FOI) follow the General Procurement Notice

(GPN) for the above project that appeared in the Market of June 2, 2004 and the United Nations development Business issue no. 633 of June 30, 2004.

The Federal Government of Nigeria (FGN) has received a credit from the International Development Association (IDA) for the implementation of 2nd National Urban Water Sector Reform Project. The project is being implemented in two (2) States and the Federal Ministry of Agriculture and Water Resources, Part of the proceeds of the credit will be applied to payment for Engineering Supervision of Obudu Dam remedial works

Objective

The objective of this assignment is to carry out engineering supervision of remedial works on Obudu Dam which were recognized as threat to the safety and integrity of the dam. Such remedial works include refurbishment of hydro-mechanical parts, refurbishment and replacement of dam electrical installation, Civil Engineering infrastructure refurbishment and other ancillary works:

Scope of the assignment

The Consulting Firm shall:-

(i) Be responsible for supervising the execution of the Works and administering the Contract;

(ii) Decide contractual matters between the Employer and the Contractor in the role representing the Employer except otherwise stated;

(iii) Approve, if they comply with specifications and drawings, the design, specifications am drawings of any proposed temporary or permanent works submitted by the Contractor where required;

(iv) Approve Contractor’s program showing the general methods, arrangements, order, and timing for all the activities in the Works and updated programme at intervals without altering the Contractor’s obligations;

(v) ensure that completion date of the programme is achieved or in event of extension of programme, decide whether and by how much to extend the Intended Completion Date;

(vi) Arrange project management meetings to review site activities and shall provide record; to those attending the meeting and to the Employer and decide responsibilities of the parties for actions to be taken either at the management meeting or after the management meeting and stated in writing to all concerns;

(vii) Check the Contractor’s work and notify the Contractor of any Defects that are found before the end of the Defects Liability and ensure that these defects are corrected before the end of the defect liability period;

(viii) Determine the value of work executed, cheek the Contractor’s monthly statement and certify the amount to be paid to the Contractor;

(ix) Issue certificate of completion if considered that the works have been completed and also issue a Defects Liability Certificate and certify any final payment that is due to the Contractor if it is corrected and completed; and

(x) Ensure that the Contractor provides “as built” Drawings and/or operating and maintenance manuals as required by the contract.

A consultant will be hired for the above mentioned assignment in accordance with the established Terms of Reference (TOR),

The scope of work envisages an engineering firm with sound technical experience in hydro Power dam engineering and strong emphasis on the following engineering fields; hydro-mechanical electrical and civil engineering.

SUBMISSION OF EXPRESSION OF INTE RESTS (EOIs)

The Federal Ministry of Agriculture and Water Resources now invites eligible Corporate Firms and/or Joint Ventures (JV) to indicate interest in providing the above mentioned services.

Interested Firms must provide information indicating that they are qualified to perform the services. This should include description of similar assignments, availability of appropriate; skills, and availability of suitable human and other logistic resources.

One original and three copies of the expression of Interest must be delivered to the address below on or before 12.00 noon on 29th July, 2009 in a sealed envelope clearly marked “Expression of Interest for Engineering Supervision of Remedial Works on Obudu Dam”

The assignment will be awarded to the successful firm on Quality and Cost Based Selection QCBS), in accordance with the procedures set out in the World Bank’s Guidelines: Selection and Employment of consultants by World Bank Borrowers, published in January 1997 (revised September 1997 January 1999, May, 2002 & May 2004).

All correspondences should be addressed to:

The Project Coordinator

Project Coordinating Unit

National Urban Water Sector Reform Project

Federal Ministry of Agriculture &: Water Resources

No 31, Aguiyi Ironsi Street (Skye Bank Building)

Maitama, Abuja

Phone : +234 (0)9 413 3203

Signed:

Otaki M. Oyigbeinu

Permanent Secretary

Federal Ministry of Agriculture & Water Resources